D'Evia vs Tujuh Residences
D'Evia is in Kwasa Damansara and Tujuh Residences is in Kwasa Damansara City Centre. D'Evia starts at RM498,100 and Tujuh Residences starts at RM494,000. That is RM4,100 between the two entry prices. Both are leasehold. Every figure below comes from each project's own sales materials.
Figures last checked August 2026 · 12 rows compared
D'Evia and Tujuh Residences, row by row
- Price from
- RM498,100RM494,000
- Where
- Kwasa DamansaraKwasa Damansara City Centre
- What it is
- Serviced apartments, a single 32-storey tower573 serviced apartments, 29 storeys, two wings
- Tenure
- LeaseholdLeasehold
- Built-up
- 657 – 1,109 sq ft550 – 909 sq ft
- Bedrooms
- Up to 4 bedrooms1 to 3, plus a dual-key Type D
- Total units
- 440 homes, 20 per floorNot stated
- Completion
- Q2 2029January 2027
- Maintenance(Per square foot, per month)
- RM0.46 psf, sinking fund includedRM0.35 psf a month, plus a 10% sinking fund
- Car park
- 2 lots; Type C takes 1 tandem + 1 single1 bay for Types A and B, 2 for Types C and D
- Nearest rail(Only where a distance is published)
- Kwasa Sentral MRT — 600 mKwasa Sentral MRT — 350 m
- Developer
- EXSIM MX4 Sdn Bhd, an EXSIM Group companyKwasa Sentral Sdn Bhd (MRCB Land with Kwasa Land)
Still deciding between these two?
Tell me your budget and what the home is for, and I’ll send the current price list for both, with the layouts still available.
WhatsApp SaraOther comparisons in Kwasa Damansara
Common questions
How much do D'Evia and Tujuh Residences cost?
D'Evia starts at RM498,100 and Tujuh Residences starts at RM494,000. The gap between them at the entry price is RM4,100. Both are the developer's starting price and move with each release, so ask Sara for the current price list before deciding.
Where are D'Evia and Tujuh Residences?
D'Evia is in Kwasa Damansara and Tujuh Residences is in Kwasa Damansara City Centre.
Are D'Evia and Tujuh Residences freehold or leasehold?
Both are leasehold, as each project's own materials state it.
When are D'Evia and Tujuh Residences due for completion?
D'Evia: Q2 2029. Tujuh Residences: January 2027. A completion date is the developer's target and can move, so treat it as a plan rather than a promise.
Where do these figures come from?
Each project's own brochure and sales materials, read and written up when its page on this site was built. This comparison reads the same source those pages render, so a figure here can never disagree with the project page it links to. Where a project's materials do not state something, the row says so rather than filling in an average.


