D'Evia vs RIA

D'Evia and RIA are both new launches in Kwasa Damansara. D'Evia starts at RM498,100 and RIA starts at RM849,000. That is RM350,900 between the two entry prices. D'Evia is leasehold and RIA is freehold, residential title. Every figure below comes from each project's own sales materials.

Figures last checked August 2026 · 12 rows compared

D'Evia and RIA, row by row

D'Evia

D'Evia

Kwasa Damansara

from RM498,100

RIA

RIA

Kwasa Damansara

from RM849,000

Price from
RM498,100RM849,000
Where
Kwasa DamansaraKwasa Damansara
What it is
Serviced apartments, a single 32-storey towerCondominium, two 21-storey blocks
Tenure
LeaseholdFreehold, residential title
Built-up
657 – 1,109 sq ft1,195 – 1,841 sq ft
Bedrooms
Up to 4 bedrooms3 to 4+1, with 3 to 5 bathrooms
Total units
440 homes, 20 per floor494 condominiums
Completion
Q2 2029January 2030
Maintenance(Per square foot, per month)
RM0.46 psf, sinking fund includedRM0.35 psf a month, sinking fund included
Car park
2 lots; Type C takes 1 tandem + 1 single2 to 3 bays, depending on unit type
Nearest rail(Only where a distance is published)
Kwasa Sentral MRT — 600 mKwasa Damansara MRT — 300 m
Developer
EXSIM MX4 Sdn Bhd, an EXSIM Group companySunsuria Damansara Sdn Bhd (Sunsuria Berhad)

Still deciding between these two?

Tell me your budget and what the home is for, and I’ll send the current price list for both, with the layouts still available.

WhatsApp Sara

Other comparisons in Kwasa Damansara

Or build your own comparison, up to five projects

Common questions

How much do D'Evia and RIA cost?
D'Evia starts at RM498,100 and RIA starts at RM849,000. The gap between them at the entry price is RM350,900. Both are the developer's starting price and move with each release, so ask Sara for the current price list before deciding.
Where are D'Evia and RIA?
Both are in Kwasa Damansara. That is what makes them worth putting side by side: the area is settled, so the comparison is about the buildings.
Are D'Evia and RIA freehold or leasehold?
D'Evia is leasehold and RIA is freehold, residential title, as each project's own materials state it.
When are D'Evia and RIA due for completion?
D'Evia: Q2 2029. RIA: January 2030. A completion date is the developer's target and can move, so treat it as a plan rather than a promise.
Where do these figures come from?
Each project's own brochure and sales materials, read and written up when its page on this site was built. This comparison reads the same source those pages render, so a figure here can never disagree with the project page it links to. Where a project's materials do not state something, the row says so rather than filling in an average.