D'Evia vs Linari
D'Evia and Linari are both new launches in Kwasa Damansara. D'Evia starts at RM498,100 and Linari starts at RM820,000. That is RM321,900 between the two entry prices. D'Evia is leasehold and Linari is freehold, residential title. Every figure below comes from each project's own sales materials.
Figures last checked August 2026 · 12 rows compared
D'Evia and Linari, row by row
- Price from
- RM498,100RM820,000
- Where
- Kwasa DamansaraKwasa Damansara
- What it is
- Serviced apartments, a single 32-storey towerCondominium, 2 blocks, plus 16 Parkhomes
- Tenure
- LeaseholdFreehold, residential title
- Built-up
- 657 – 1,109 sq ft1,168 – 1,230 sq ft
- Bedrooms
- Up to 4 bedroomsUp to 3+1 bedrooms
- Total units
- 440 homes, 20 per floor496 (480 condominiums + 16 Parkhomes)
- Completion
- Q2 2029December 2027
- Maintenance(Per square foot, per month)
- RM0.46 psf, sinking fund includedRM0.35 psf a month, sinking fund extra
- Car park
- 2 lots; Type C takes 1 tandem + 1 single2 bays per condominium home
- Nearest rail(Only where a distance is published)
- Kwasa Sentral MRT — 600 mKwasa Damansara MRT — 35 steps via the private gateway — 350 m
- Developer
- EXSIM MX4 Sdn Bhd, an EXSIM Group companyLinari Damansara Sdn Bhd (Serene Impian)
Still deciding between these two?
Tell me your budget and what the home is for, and I’ll send the current price list for both, with the layouts still available.
WhatsApp SaraOther comparisons in Kwasa Damansara
Common questions
How much do D'Evia and Linari cost?
D'Evia starts at RM498,100 and Linari starts at RM820,000. The gap between them at the entry price is RM321,900. Both are the developer's starting price and move with each release, so ask Sara for the current price list before deciding.
Where are D'Evia and Linari?
Both are in Kwasa Damansara. That is what makes them worth putting side by side: the area is settled, so the comparison is about the buildings.
Are D'Evia and Linari freehold or leasehold?
D'Evia is leasehold and Linari is freehold, residential title, as each project's own materials state it.
When are D'Evia and Linari due for completion?
D'Evia: Q2 2029. Linari: December 2027. A completion date is the developer's target and can move, so treat it as a plan rather than a promise.
Where do these figures come from?
Each project's own brochure and sales materials, read and written up when its page on this site was built. This comparison reads the same source those pages render, so a figure here can never disagree with the project page it links to. Where a project's materials do not state something, the row says so rather than filling in an average.


