Haus on 15 vs Trybe Residences

Haus on 15 is in SS15 and Trybe Residences is in USJ 7. Haus on 15 starts at RM690,000 and Trybe Residences starts at RM486,800. That is RM203,200 between the two entry prices. Both are freehold. Every figure below comes from each project's own sales materials.

Figures last checked August 2026 · 12 rows compared

Haus on 15 and Trybe Residences, row by row

Haus on 15

Haus on 15

SS15

from RM690,000

Trybe Residences

Trybe Residences

USJ 7

from RM486,800

Price from
RM690,000RM486,800
Where
SS15USJ 7
What it is
Serviced residence, two 24-storey towersNot stated
Tenure
FreeholdFreehold
Built-up
690 – 980 sq ft730 – 920 sq ft
Bedrooms
Up to 3 bedrooms2 or 3
Total units
522998 in two towers
Completion
2029March 2031
Maintenance(Per square foot, per month)
RM0.44 psf per monthRM0.42 psf a month, sinking fund included
Car park
1 bay for Types A and B, 2 for Types C, D and EType A 1 to 2 bays · Type B 2 bays
Nearest rail(Only where a distance is published)
SS15 LRT Station — 500 mUSJ7 LRT-BRT Interchange Station — 400 m
Developer
Gamuda Land with Taylor's AssetsSime Darby Property (SJ7) Sdn Bhd

Still deciding between these two?

Tell me your budget and what the home is for, and I’ll send the current price list for both, with the layouts still available.

WhatsApp Sara

Other comparisons in Subang

Or build your own comparison, up to five projects

Common questions

How much do Haus on 15 and Trybe Residences cost?
Haus on 15 starts at RM690,000 and Trybe Residences starts at RM486,800. The gap between them at the entry price is RM203,200. Both are the developer's starting price and move with each release, so ask Sara for the current price list before deciding.
Where are Haus on 15 and Trybe Residences?
Haus on 15 is in SS15 and Trybe Residences is in USJ 7.
Are Haus on 15 and Trybe Residences freehold or leasehold?
Both are freehold, as each project's own materials state it.
When are Haus on 15 and Trybe Residences due for completion?
Haus on 15: 2029. Trybe Residences: March 2031. A completion date is the developer's target and can move, so treat it as a plan rather than a promise.
Where do these figures come from?
Each project's own brochure and sales materials, read and written up when its page on this site was built. This comparison reads the same source those pages render, so a figure here can never disagree with the project page it links to. Where a project's materials do not state something, the row says so rather than filling in an average.