The schedule is law, not the developer's choice
A new condominium or serviced apartment in Malaysia is sold on a statutory contract. For a building to be subdivided into parcels — which is what strata property is — that contract is Schedule H to the Housing Development (Control and Licensing) Regulations 1989. The developer fills in the names, the parcel and the ringgit amounts. The stages, the percentages and the order they fall in are set by the regulations, and are the same whichever developer you buy from.
That is worth knowing before you sit down at the sales gallery, because it means the payment schedule is not something to negotiate or be talked through quickly. It is the same document every buyer in the country signs, and you can read it before you go.
What you pay at each stage
Ten per cent on signing, then eight construction stages, then the balance around handover. Each instalment falls due within thirty days of the developer giving you written notice that the stage is complete, certified by the project's architect.
| When | Stage | % of price |
|---|---|---|
| On signing | Immediately upon signing the agreement | 10% |
| During construction | Work below ground level, including the foundation | 10% |
| The structural framework of your parcel | 15% | |
| Walls of your parcel, with door and window frames in position | 10% | |
| Roofing and ceiling, electrical wiring, plumbing without fittings, gas piping and internal telecoms cabling | 10% | |
| Internal and external finishes, including wall finishes | 10% | |
| Sewerage works serving the building | 5% | |
| Drains serving the building | 2.5% | |
| Roads serving the building | 2.5% | |
| At handover | Vacant possession, with water and electricity ready for connection | 17.5% |
| Transfer instrument and strata title delivered to you or your solicitor | 2.5% | |
| After handover | Held by the developer's solicitor as stakeholder for defects | 5% |
Most of this is the bank's money, not yours
The common misreading of that table is that you have to find the money twelve times. You do not. If you are buying with a loan, the 10% on signing is yours — along with the booking fee it is usually drawn from, your legal fees and your stamp duty. Almost everything after that is released by your bank directly to the developer as each stage is certified.
- You pay the 10% on signing, plus legal fees and stamp duty on the transfer and the loan.
- Your bank releases each construction instalment on the architect's certificate — you sign nothing further at each stage.
- You start paying interest only on what the bank has actually released, so the monthly figure climbs as the building goes up.
- Your full monthly instalment begins once the loan is fully drawn down, at or around handover.
That rising interest during construction is the part worth planning for. For the first year or two it is small, and by the final stages it is close to a full instalment — while you may still be paying rent somewhere else.
What happens at handover
Vacant possession is the moment the property becomes yours to use. Under Schedule H it carries 17.5% of the price, and it is only due when water and electricity are ready for connection — not when the building merely looks finished.
A further 2.5% falls due when the developer delivers the instrument of transfer together with the original issue document of strata title. On many projects the title takes longer than the keys, so this instalment often sits outstanding for a while after you have moved in.
The 5% that is kept back for defects
The final 5% is paid at handover but not to the developer. It goes to the developer's solicitor, who holds it as stakeholder and releases it in two halves: 2.5% eight months after you take vacant possession, and 2.5% twenty-four months after.
That money is the leverage behind the defect liability period. Any defect that appears within twenty-four months of vacant possession, and is down to poor workmanship, poor materials or the building not matching the approved plans, must be repaired by the developer at its own cost within thirty days of your written notice.
If the developer is late — and if you are
Schedule H gives the developer thirty-six months from the date of the agreement to deliver vacant possession. Miss it, and the developer owes you liquidated damages calculated from day to day at 10% per annum of the purchase price, running from the end of that period until the day you actually take possession. You do not have to sue for it or prove a loss; if it is not paid, you are entitled to deduct it from an instalment still due.
The obligation runs the other way too. An instalment unpaid after its thirty-day window attracts late payment charges at the same 10% per annum, calculated from day to day. Where the delay is the bank's — a loan from a government body being slow to release — the developer is not entitled to charge you for it.
| Period | Rate | |
|---|---|---|
| Developer must deliver vacant possession | 36 months from the agreement | — |
| Liquidated damages if late | From the end of month 36 until handover | 10% a year on the purchase price |
| Your instalment falls due | 30 days from written notice | — |
| Late payment charges if you are late | From the day it falls due | 10% a year on the unpaid amount |
| Defect liability | 24 months from vacant possession | — |